Swimming & Wading Pool Replacement
The Burnt Cedar Pool Complex is a recreational facility within the Incline Village GID that is situated on the shore of beautiful Lake Tahoe. Based on reported leaking and ongoing maintenance to preserve the swimming and wading pools, District trustees reviewed an analysis report that compared repair versus replacement costs and decided to replace the existing swimming and wading pools.
Engineering Design
RCI was retained as the civil engineering design consultant, working as a part of the overall design team that consisted of TSK Architects, Aquatic Design Group, Design Workshop, Nelson-Wilcox Structural Engineers, and MSA. RCI’s primary responsibilities involved initial project planning, site surveying, schematic site design through final site design, construction cost estimates, construction administration, and record drawings.
ADA, BMP, and Construction Administration
RCI site design included grading and drainage design of the split-level pool complex, Americans with Disabilities Act (ADA) accessibility from the parking lot throughout the aquatic facility, paved perimeter walking path and retaining wall, sanitary sewer force main rerouting, storm drain system design, erosion control, and Best Management Practice (BMP) calculations and design.